The 2014 Commonwealth Games is aiming for a gold medal in reducing energy bills. The Emirates Arena in Glasgow and the surrounding Arena Athletes' Village are both lined up for heat-saving measures. The city council has given the green light for £3.67 million to connect a purpose-built energy centre to the two venues and support a long-term operating and maintenance contract. The energy centre has three boilers and a combined heat and power engine.